Due to the General Affairs Division’s high-voltage power substation annual check-up at the Taipei campus on July 14th, 2023 (Friday). The Information and Network Division is expected to shut down the servers in Server-Room in advance, from 8:00 a.m. to 5:00 p.m. All information systems, Moodle system and Cloud Lab sytem will be temporarily unavailable during the period. After power is restored, servers and devices in Server-Room will be checked to see if they can power-on and operate normally. All information system services will be restored gradually. If the power engineering of the General Affairs Division is finished ahead of schedule, the services will be restored in advance without further notice. We apologize for any inconvenience caused.
Scope of impact: Information systems and services located in the Server-Room.
Services affected: University Affairs System, Moodle System and Cloud Lab Sytem, etc.
Contact person: Li, Cheng-Hsien, System Development Section Ext.: 2552